Building Progress, November 06, 2009

All photos by Brad Elliott
  • Workers install controls inside the high-tech Central Plant building
  • Large cooling equipment is delivered to the roof of the Central Plant
  • Heavy machinery sand slits the field at the new track and field/soccer complex
  • Workers layout and frame the interior of Winter Hall
  • The top level of Winter Hall has three office areas that surround a central atrium
  • The Winter Hall offices are clustered around lounges, which open to a landscaped roof deck
  • Workers continue to frame and waterproof the exterior of Winter Hall
  • Sparks are flying at the west side of Winter Hall where workers frame the exterior
  • The top floor of Adams Center from the east looking west
  • The top floor of Adams Center from the west looking east toward the formal garden
  • The western pavilion at Adams Center will hold the printmaking and painting studios
  • The Adams Center eastern pavilion will house the gallery and gallery reception area
  • From Whittier Science looking south, the upper-level lounges of Winter Hall take shape
  • A landscaped pedestrian area is being created in between the library and Adams Center
  • The baseball field has been modified to accommodate the observatory in left-center field
  • Looking east at the observatory, workers create seating above the new track
  • The county has already issued a certificate of occupancy for the new observatory
  • Crews have built a retaining wall below the observatory at the track and field/soccer complex
  • Workers install utilities to the track storage building, south east of the soccer complex
  • The new building will house restrooms, track storage and a scorerâs area
  • The playing fields have been leveled, literally, thanks to dirt from Adams Center and Winter Hall