  • Construction of the Global Learning Center is proceeding on many fronts.
  • Concrete slabs and retaining walls have been poured. Three pours are scheduled for the week of Oct. 10. The slabs for the residence buildings will be complete following these pours.
  • Soon installation of steel framing and wood wall panels will begin.
  • Underground utilities, water, electrical and sewer are being installed for the common building and residences.
  • Rain gardens to collect rain water are in process. These shallow basins allow rain water to percolate into the soil on the site.
  • Behind Van Kampen the hillside has been graded for the installation of a retaining wall. The wall will permit the road to be widened to accommodate fire trucks.